August 26th, 2013, 11:19 PM
|
#1 (permalink)
|
Junior Member
- Join Date:
- Aug 2013
- Posts:
- 1
- Liked:
- 0 times
|
Production Per Head Opinions
I'm looking for opinions.
What do you think?
Ok, I know there's a thousand variables, but there has to be a number that you can use as a base production number per embroidery head. If you consider that some 7000 stitch jobs run 3 an hour and that some 50000 stitch applique backs take an hour and a half to run there still has to be a number that will be a rough average over weeks and months.
I believe that you should be able to average 1 run per head per hour.
What do you think?
Thanks,
Sam
|
|
|